In progress

No.1 House

Bangkok

No.1 House from the lane: perforated metal screens behind bamboo scaffold, with overhead cables in front

Project details

  1. 01Consult
  2. 02Plan
  3. 03Build
  4. 04Control
  5. 05Deliver

A house on a Bangkok lane, wrapped in perforated metal screens under a pitched roof. The screens are going up behind bamboo scaffold and the tiling inside has started.

Location
Bangkok
Province
Bangkok
Service
Construction
Status
In progress
Stage
03 Build
Contractor
CON31 Prosper Group
Perforated metal screens going up behind the bamboo scaffold
01Screens going up
Looking up past the screen to the sky from the side passage
02Side passage
Wall tiles set out with levelling clips, a ladder in the corner
03Wall tiling
The architect’s 3D visualisation of the finished house from the lane: a pitched roof over perforated screens, behind a white wall and gate
043D visualisation of the design